The Third Mainland Bridge in Lagos is formally announced to be shut down for a while on Thursday by the Federal Government, To allow for the necessary repairs, the shutdown will start at midnight on Saturday, October 21, and run until midnight on Sunday, October 22.
In a statement, Mrs. Olukorede Kesha, the Federal Controller of Works in Lagos State, said the government was prepared to commence extensive restoration work on the bridge, commencing with repairs of the crucial sections.
You may also like to read this
As Tinubu Removes the Registrar, CAC Employees Rejoice (video)
She stated ;
However, in order to alleviate the pains currently being experienced on the bridge, the Ministry would be carrying out palliative works on the most critically failed sections along the Adeniji bound carriageway on Sunday, Oct. 22, preparatory to the comprehensive repair works.”
She asked motorists to cooperate with the traffic control officials by obeying and observing all diversions as indicated for seamless travel.
She stated ;
“However, motorists are encouraged to use alternative routes where possible during the period of the palliative works as the Adeniji bound of the bridge will be closed to traffic from Saturday, Oct. 21 to Sunday, 22nd 12.00 midnight.”
The Post ‘Third Mainland Bridge Will Be Closed By FG For Repairs’ initially appeared on Tori